Marco Schutten
Marco Schutten
Verified email at utwente.nl - Homepage
Title
Cited by
Cited by
Year
Vehicle routing under time-dependent travel times: the impact of congestion avoidance
AL Kok, EW Hans, JMJ Schutten
Computers & operations research 39 (5), 910-918, 2012
1922012
A dynamic programming heuristic for the vehicle routing problem with time windows and European Community social legislation
AL Kok, CM Meyer, H Kopfer, JMJ Schutten
Transportation Science 44 (4), 442-454, 2010
131*2010
Practical job shop scheduling
JMJ Schutten
Annals of Operations Research 83, 161-178, 1998
951998
Parallel machine scheduling with release dates, due dates and family setup times
JMJ Schutten, RAM Leussink
International journal of production economics 46, 119-125, 1996
921996
Joint optimization of level of repair analysis and spare parts stocks
RJI Basten, MC Van der Heijden, JMJ Schutten
European journal of operational research 222 (3), 474-483, 2012
872012
Inventory routing for dynamic waste collection
M Mes, M Schutten, AP Rivera
Waste management 34 (9), 1564-1576, 2014
852014
Single-machine scheduling with release dates, due dates and family setup times
JMJ Schutten, SL Van de Velde, WHM Zijm
Management Science 42 (8), 1165-1174, 1996
771996
Restricted dynamic programming: a flexible framework for solving realistic VRPs
J Gromicho, JJ van Hoorn, AL Kok, JMJ Schutten
Computers & operations research 39 (5), 902-909, 2012
752012
List scheduling revisited
JMJ Schutten
Operations Research Letters 18 (4), 167-170, 1996
751996
Waiting profiles: An efficient protocol for enabling distributed planning of container barge rotations along terminals in the port of Rotterdam
A Douma, M Schutten, P Schuur
Transportation Research Part C: Emerging Technologies 17 (2), 133-148, 2009
682009
An efficient model formulation for level of repair analysis
RJI Basten, JMJ Schutten, MC Van Der Heijden
Annals of Operations Research 172 (1), 119, 2009
642009
Optimizing departure times in vehicle routes
AL Kok, EW Hans, JMJ Schutten
European Journal of Operational Research 210 (3), 579-587, 2011
622011
Linear-programming-based heuristics for project capacity planning
N Gademann, M Schutten
Iie Transactions 37 (2), 153-165, 2005
572005
Multi-hop driver-parcel matching problem with time windows
W Chen, M Mes, M Schutten
Flexible services and manufacturing journal 30 (3), 517-553, 2018
562018
Time-constrained project scheduling
TA Guldemond, JL Hurink, JJ Paulus, JMJ Schutten
Journal of Scheduling 11 (2), 137-148, 2008
502008
A dynamic programming heuristic for vehicle routing with time-dependent travel times and required breaks
AL Kok, EW Hans, JMJ Schutten, WHM Zijm
Flexible Services and Manufacturing Journal 22 (1), 83-108, 2010
482010
A minimum cost flow model for level of repair analysis
RJI Basten, MC Van der Heijden, JMJ Schutten
International Journal of Production Economics 133 (1), 233-242, 2011
472011
A decision support system for ship maintenance capacity planning
R De Boer, JMJ Schutten, WHM Zijm
CIRP Annals 46 (1), 391-396, 1997
441997
An approximate approach for the joint problem of level of repair analysis and spare parts stocking
RJI Basten, MC Van der Heijden, JMJ Schutten, E Kutanoglu
Annals of operations research 224 (1), 121-145, 2015
382015
Inventory reduction in spare part networks by selective throughput time reduction
MC van der Heijden, EM Alvarez, JMJ Schutten
International journal of production economics 143 (2), 509-517, 2013
382013
The system can't perform the operation now. Try again later.
Articles 1–20