Development of workspace conflict visualization system using 4D object of work schedule HS Moon, N Dawood, LS Kang Advanced Engineering Informatics 28 (1), 50-65, 2014 | 160 | 2014 |
Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces HS Moon, HS Kim, CH Kim, LS Kang Automation in Construction 39, 93-105, 2014 | 107 | 2014 |
BIM-based construction scheduling method using optimization theory for reducing activity overlaps H Moon, H Kim, VR Kamat, L Kang Journal of Computing in Civil Engineering 29 (3), 04014048, 2015 | 86 | 2015 |
Development of a 4D object-based system for visualizing the risk information of construction projects LS Kang, SK Kim, HS Moon, HS Kim Automation in Construction 31, 186-203, 2013 | 62 | 2013 |
Development of methodology and virtual system for optimised simulation of road design data LS Kang, HS Moon, N Dawood, MS Kang Automation in Construction 19 (8), 1000-1015, 2010 | 53 | 2010 |
Highway alignment construction comparison using object-oriented 3D visualization modeling H Kim, K Orr, Z Shen, H Moon, K Ju, W Choi Journal of Construction Engineering and Management 140 (10), 05014008, 2014 | 52 | 2014 |
Integration of BIM and GIS: Highway cut and fill earthwork balancing H Kim, Z Chen, CS Cho, H Moon, K Ju, W Choi Computing in civil engineering 2015, 468-474, 2015 | 33 | 2015 |
Case study of solar photovoltaic power-plant site selection for infrastructure planning using a BIM-GIS-based approach J Heo, H Moon, S Chang, SU Han, DE Lee Applied Sciences 11 (18), 8785, 2021 | 31 | 2021 |
Development of BIM Library for Civil Structures based on Standardized Drawings-Focused on 2D Standard Drawings of The MOLIT HS Moon, KB Ju Korean Journal of Computational Design and Engineering 19 (1), 80-90, 2014 | 27 | 2014 |
Improved link system between schedule data and 3D object in 4D CAD system by using WBS code LS Kang, HS Moon, SY Park, CH Kim, TS Lee KSCE Journal of Civil Engineering 14, 803-814, 2010 | 27 | 2010 |
Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation LS Kang, HS Kim, HS Moon, SK Kim Automation in Construction 68, 32-43, 2016 | 26 | 2016 |
Developing a 3D intelligent object model for the application of construction planning/simulation in a highway project H Kim, Z Shen, H Moon, K Ju, W Choi KSCE Journal of Civil Engineering 20, 538-548, 2016 | 24 | 2016 |
BIM functions for optimized construction management in civil engineering HS Moon, HS Kim, LS Kang, CH Kim ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2012 | 22 | 2012 |
Configuration method of health and safety rule for improving productivity in construction space by multi-dimension CAD system H Moon, L Kang, N Dawood, S Ji Iccem/iccpm, 2009 | 17 | 2009 |
Data management framework of drone-based 3D model reconstruction of disaster site C Kim, H Moon, W Lee The International Archives of the Photogrammetry, Remote Sensing and Spatial …, 2016 | 16 | 2016 |
Development of improved 4D CAD system for horizontal works in civil engineering projects L Kang, J Pyeon, H Moon, C Kim, M Kang Journal of computing in civil engineering 27 (3), 212-230, 2013 | 15 | 2013 |
Development of 5D CAD system for visualizing risk degree and progress schedule for construction project LS Kang, HS Moon, HS Kim, GY Choi, CH Kim Computing in Civil Engineering (2011), 690-697, 2011 | 15 | 2011 |
4D system for visualizing schedule progress of horizontal construction project including earthwork S Leen CONVR 2006, 2006 | 15 | 2006 |
A uav based 3-d positioning framework for detecting locations of buried persons in collapsed disaster area H Moon, C Kim, W Lee The International Archives of the Photogrammetry, Remote Sensing and Spatial …, 2016 | 14 | 2016 |
Development and verification of a module for positioning buried persons in collapsed area HS Moon, WS Lee Journal of the Korea Academia-Industrial cooperation Society 17 (12), 427-436, 2016 | 13 | 2016 |