Follow
Tatsuya Sakurahara
Tatsuya Sakurahara
Department of Nuclear, Plasma, and Radiological Engineering, University of Illinois Urbana-Champaign
Verified email at illinois.edu - Homepage
Title
Cited by
Cited by
Year
Simulation-informed probabilistic methodology for common cause failure analysis
T Sakurahara, G Schumock, S Reihani, E Kee, Z Mohaghegh
Reliability Engineering & System Safety 185, 84-99, 2019
482019
An integrated methodology for spatio-temporal incorporation of underlying failure mechanisms into fire probabilistic risk assessment of nuclear power plants
T Sakurahara, Z Mohaghegh, S Reihani, E Kee, M Brandyberry, ...
Reliability Engineering & System Safety 169, 242-257, 2018
412018
Data-theoretic methodology and computational platform to quantify organizational factors in socio-technical risk analysis
J Pence, T Sakurahara, X Zhu, Z Mohaghegh, M Ertem, C Ostroff, E Kee
Reliability Engineering & System Safety 185, 240-260, 2019
362019
Global importance measure methodology for integrated probabilistic risk assessment
T Sakurahara, S Reihani, E Kee, Z Mohaghegh
Proceedings of the Institution of Mechanical Engineers, Part O: Journal of …, 2020
292020
An algorithm for enhancing spatiotemporal resolution of probabilistic risk assessment to address emergent safety concerns in nuclear power plants
H Bui, T Sakurahara, J Pence, S Reihani, E Kee, Z Mohaghegh
Reliability Engineering & System Safety 185, 405-428, 2019
222019
Methodological and practical comparison of integrated probabilistic risk assessment (I-PRA) with the existing fire PRA of nuclear power plants
T Sakurahara, Z Mohaghegh, S Reihani, E Kee
Nuclear technology 204 (3), 354-377, 2018
182018
Integrated PRA Methodology to Advance Fire Risk Modeling for Nuclear Power Plants
T Sakurahara, S Reihani, Z Mohaghegh, M Brandyberry, E Kee, ...
Annual European Safety and Reliability Conference 2015 (ESREL 2015), 2015
162015
Integrated Risk-Informed Design (I-RID) methodological framework and computational application for FLEX equipment storage buildings of Nuclear Power Plants
G Schumock, S Zhang, P Farshadmanesh, JG Owens, N Kasza, J Stearns, ...
Progress in Nuclear Energy 120, 103186, 2020
152020
RoverD: use of test data in GSI-191 risk assessment
E Kee, J Hasenbein, A Zolan, P Grissom, S Reihani, Z Mohaghegh, ...
Nuclear Technology 196 (2), 270-291, 2016
152016
A new integrated framework to advance fire probabilistic risk analysis of nuclear power plants
T Sakurahara, Z Mohaghegh, E Kee, S Rodgers, M Brandyberry, ...
Transactions of the American Nuclear Society 109 (PART 2), 2056-2060, 2013
152013
Integrating renewal process modeling with Probabilistic Physics-of-Failure: Application to Loss of Coolant Accident (LOCA) frequency estimations in nuclear power plants
T Sakurahara, N O'Shea, WC Cheng, S Zhang, S Reihani, E Kee, ...
Reliability Engineering & System Safety 190, 106479, 2019
142019
GIS‐based integration of social vulnerability and level 3 probabilistic risk assessment to advance emergency preparedness, planning, and response for severe nuclear power plant …
J Pence, I Miller, T Sakurahara, J Whitacre, S Reihani, E Kee, ...
Risk analysis 39 (6), 1262-1280, 2019
142019
Modeling the interface of manual fire protection actions with fire progression in fire probabilistic risk assessment of nuclear power plants
T Sakurahara, Z Mohaghegh, S Reihani, E Kee
International Topical Meeting on Probabilistic Safety Assessment and …, 2017
112017
Developing a new fire PRA framework by integrating probabilistic risk assessment with a fire simulation module
T Sakurahara, S Reihani, Z Mohaghegh, M Brandyberry, E Kee, ...
12th International Topical Meeting on Probabilistic Safety Assessment and …, 2014
112014
Analyzing Importance Measure Methodologies for Integrated Probabilistic Risk Assessment in Nuclear Power Plants
T Sakurahara, S Reihani, M Ertem, Z Mohaghegh, E Kee
12th Probabilistic Safety Assessment and Management Conference (PSAM 12 …, 2014
112014
Review and categorization of existing studies on the estimation of probabilistic failure metrics for Reactor Coolant Pressure Boundary piping and steam generator tubes in …
WC Cheng, T Sakurahara, S Zhang, P Farshadmanesh, S Reihani, E Kee, ...
Progress in Nuclear Energy 118, 103105, 2020
102020
Spatiotemporal integration of an agent-based first responder performance model with a fire hazard propagation model for probabilistic risk assessment of nuclear power plants
H Bui, T Sakurahara, S Reihani, E Kee, Z Mohaghegh
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part B …, 2020
82020
Spatio-temporal probabilistic methodology and computational platform for common cause failure modeling in risk analysis
T Sakurahara, G Schumock, T Murase, Z Mohaghegh, S Reihani, E Kee
2017 International Topical Meeting on Probabilistic Safety Assessment and …, 2017
82017
Global sensitivity analysis to rank parameters of stress corrosion cracking in the spatio-temporal probabilistic model of loss of coolant accident frequencies
WC Cheng, C Ding, N O'Shea, T Sakurahara, G Schumock, Z Mohaghegh, ...
2017 International Topical Meeting on Probabilistic Safety Assessment and …, 2017
72017
SHAKE-RoverD Framework for Nuclear Power Plants: A Streamlined Approach for Seismic Risk Assessment
P Farshadmanesh, T Sakurahara, S Reihani, E Kee, Z Mohaghegh
Nuclear Technology 205 (3), 442-463, 2019
62019
The system can't perform the operation now. Try again later.
Articles 1–20