Seuraa
Gursel Suer
Gursel Suer
Professor of Industrial and Systems Engineering, Ohio University
Vahvistettu sähköpostiosoite verkkotunnuksessa ohio.edu
Nimike
Viittaukset
Viittaukset
Vuosi
Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method
D Castro-Lacouture, GA Süer, J Gonzalez-Joaqui, JK Yates
Journal of Construction Engineering and Management 135 (10), 1096-1104, 2009
1122009
Optimal operator assignment and cell loading in labor-intensive manufacturing cells
GA Süer
Computers & industrial engineering 31 (1-2), 155-158, 1996
1001996
Designing parallel assembly lines
GA Süer
Computers & industrial engineering 35 (3-4), 467-470, 1998
971998
Design of dedicated, shared and remainder cells in a probabilistic demand environment
GA Süer, J Huang, S Maddisetty
International journal of production research 48 (19), 5613-5646, 2010
852010
Multi-period operator assignment considering skills, learning and forgetting in labour-intensive cells
GA Süer, RR Tummaluri
International Journal of Production Research 46 (2), 469-493, 2008
832008
Stochastic skill-based manpower allocation in a cellular manufacturing system
G Egilmez, B Erenay, GA Süer
Journal of Manufacturing Systems 33 (4), 578-588, 2014
822014
Optimal operator assignment and cell loading when lot-splitting is allowed
GA Süer, IS Bera
Computers & Industrial Engineering 35 (3-4), 431-434, 1998
801998
A dispatching rule-based genetic algorithm for multi-objective job shop scheduling using fuzzy satisfaction levels
J Huang, GA Süer
Computers & Industrial Engineering 86, 29-42, 2015
752015
Intra-cell manpower transfers and cell loading in labor-intensive manufacturing cells
GA Süer, C Dagli
Computers & Industrial Engineering 48 (3), 643-655, 2005
712005
Stochastic cellular manufacturing system design subject to maximum acceptable risk level
G Egilmez, GA Süer, J Huang
Computers & Industrial Engineering 63 (4), 842-854, 2012
702012
Stochastic mixed-model assembly line sequencing problem: Mathematical modeling and Q-learning based simulated annealing hyper-heuristics
H Mosadegh, SMTF Ghomi, GA Süer
European Journal of Operational Research 282 (2), 530-544, 2020
682020
Effects of Different Fuzzy Operators on Fuzzy Bi-objective Cell Loading Problem in Labor Intensive Manufacturing Cells
GA Suer, F Arikan, C Babayigit
Proceedings of the 35th International Conference on Computers and Industrial …, 2005
68*2005
Evaluation of manufacturing cell loading rules for independent cells
GA Suer, M Saiz, W Gonzalez
International Journal of Production Research 37 (15), 3445-3468, 1999
621999
Effective multiobjective EDA for bi-criteria stochastic job-shop scheduling problem
X Hao, M Gen, L Lin, GA Suer
Journal of intelligent Manufacturing 28, 833-845, 2017
562017
Minimizing the number of tardy jobs in identical machine scheduling
GA Süer, E Báez, Z Czajkiewicz
Computers & Industrial Engineering 25 (1-4), 243-246, 1993
541993
A hybrid method of 2-TSP and novel learning-based GA for job sequencing and tool switching problem
E Ahmadi, B Goldengorin, GA Süer, H Mosadegh
Applied Soft Computing 65, 214-229, 2018
502018
Models for cell loading and product sequencing in labor-intensive cells
GA Süer, J Cosner, A Patten
Computers & Industrial Engineering 56 (1), 97-105, 2009
502009
Manufacturing cell loading rules and algorithms for connected cells
GA Süer, M Saiz, C Dagli, W Gonzalez
Manufacturing Research and Technology 24, 97-127, 1995
461995
Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells
GA Süer, F Arikan, C Babayiğit
International Journal of Production Research 46 (2), 371-404, 2008
422008
Comparison of layered cellular manufacturing system design approaches
B Erenay, GA Suer, J Huang, S Maddisetty
Computers & Industrial Engineering 85, 346-358, 2015
412015
Järjestelmä ei voi suorittaa toimenpidettä nyt. Yritä myöhemmin uudelleen.
Artikkelit 1–20