Follow
Monjurul Hasan
Title
Cited by
Cited by
Year
Durability of mortar and concrete made up of pozzolans as a partial replacement of cement: A review
MM Hossain, M Hasan, MR Karim, MK Hossain, MFM Zain
Construction and Building Materials 116, 128–140, 2016
2472016
Prediction of compressive strength of concrete from early age test result
MM Hasan, A Kabir
4th Annual Paper Meet and 1st Civil Engineering Congress, 01-07, 2011
422011
Predicting 28 Days Compressive Strength of Concrete from 7 Days Test Result
A Kabir, M Hasan, MK Miah
International Conference on Advances in Design and Construction of …, 2012
392012
Error Propagation Model for Analyzing Project Labor Cost Budget Risks in Industrial Construction
M Hasan, M Lu
Journal of Construction Engineering and Management 147 (4), 04021007, 2021
152021
Early Age Tests to Predict 28 Days Compressive Strength of Concrete
M Hasan, A Kabir
Caspian Journal of Applied Sciences Research 2 (Proceedings of AICCE'12 …, 2013
152013
Strength Prediction Model for Concrete
A Kabir, M Hasan, MK Miah
International Journal on Civil and Environmental Engineering 2 (1), 14-19, 2013
112013
Error Quantification and Visualization in Using Sensors to Position Backhoe Excavator
M Hasan, M Lu
Computing in Civil Engineering, 150-157, 2017
72017
Properties of Fly Ash Brick Prepared in Local Environment of Bangladesh
R Islam, M Hasan, MR Karim, MFM Zain
International Journal of Civil, Environmental, Structural, Construction and …, 2015
72015
Planning and Scheduling Bridge Girders Fabrication Through Shop-floor Operations Simulation
M Hasan, M Lu, K Bird
2019 European Conference on Computing in Construction, 75-84, 2019
52019
Concrete Mix Design Using Artificial Neural Network
MM Hasan
Bangladesh University of Engineering & Technology, 2012
52012
Variance Analysis on Regression Models for Estimating Labor Costs of Prefabricated Components
M Hasan, M Lu
Journal of Computing in Civil Engineering 36 (5), 04022019, 2022
42022
Proposing a “lean and green” framework for equipment cost analysis in construction
M Lu, N Hernandez, M Hasan
Frontiers of Engineering Management 6 (2), 384–394, 2019
42019
Developing a Cost-Effective and Adaptive Training Program to Enhance Construction Safety in Tunneling Construction
M Lu, M Hasan
Construction Research Congress 2018, 635 - 644, 2018
42018
Simulation Based Approach to Systematic Project Planning and Scheduling at a Bridge Fabrication Shop
M Hasan, M Lu, C Ritcey
Winter Simulation Conference (WSC) 2019, 3019-3030, 2019
32019
Productivity Improvement in Operating Autonomous Plants Subject to Random Breakdowns in Construction
M Lu, M Hasan
Winter Simulation Conference (WSC) 2018, 3885 - 3896, 2018
32018
RSMeans-Guided Approach to Detailed Cost Estimating: A Residential Project Case.
N Diaz, M Hasan, M Lu
17th International Conference on Computing in Civil and Building Engineering …, 2018
32018
Planning Work for a Self-Tracking Excavator Capable of Automatic Field Survey
M Hasan, M Lu
17th International Conference on Computing in Civil and Building Engineering …, 2018
32018
Global Sensitivity Analysis Methodology for Construction Simulation Models: Multiple Linear Regressions versus Multilayer Perceptions
S Wang, M Hasan, M Lu
Construction Engineering and Management 150 (4), 04024035, 2024
22024
A Framework to Evaluate the School Infrastructure Project Need Using Fuzzy Expert System
M Hasan, R Newton
Canadian Society of Civil Engineering Annual Conference 2021, 395, 2021
22021
Three-Tiered Simulation Framework for Modeling Bridge Girders Fabrication Processes in a Steel Fabrication Shop
M Lu, M Hasan, A Mohsenijam
Computing in Civil Engineering, 553-560, 2019
22019
The system can't perform the operation now. Try again later.
Articles 1–20