Seuraa
Peter Moser
Peter Moser
Vice Rector, University of Leoben
Vahvistettu sähköpostiosoite verkkotunnuksessa unileoben.ac.at
Nimike
Viittaukset
Viittaukset
Vuosi
The state of environmental sustainability considerations in mining
M Tost, M Hitch, V Chandurkar, P Moser, S Feiel
Journal of cleaner production 182, 969-977, 2018
1522018
Damage of basalt induced by microwave irradiation
P Hartlieb, M Leindl, F Kuchar, T Antretter, P Moser
Minerals Engineering 31, 82-89, 2012
1312012
Microwave heating of dry and water saturated basalt, granite and sandstone
T Peinsitt, F Kuchar, P Hartlieb, P Moser, H Kargl, U Restner, ...
International Journal of Mining and Mineral Engineering 2 (1), 18-29, 2010
1242010
Europe's mining innovation trends and their contribution to the sustainable development goals: Blind spots and strong points
A Endl, M Tost, M Hitch, P Moser, S Feiel
Resources Policy 74, 101440, 2021
972021
Size distribution functions for rock fragments
JA Sanchidrián, F Ouchterlony, P Segarra, P Moser
International Journal of Rock Mechanics and Mining Sciences 71, 381-394, 2014
822014
Reaction of different rock types to low-power (3.2 kW) microwave irradiation in a multimode cavity
P Hartlieb, F Kuchar, P Moser, H Kargl, U Restner
Minerals Engineering 118, 37-51, 2018
682018
Metal Mining’s Environmental Pressures: A Review and Updated Estimates on CO2 Emissions, Water Use, and Land Requirements
M Tost, B Bayer, M Hitch, S Lutter, P Moser, S Feiel
Sustainability 10 (8), 2881, 2018
532018
Percentile fragment size predictions for blasted rock and the fragmentation–energy fan
F Ouchterlony, JA Sanchidrián, P Moser
Rock mechanics and rock engineering 50, 751-779, 2017
462017
Performance of some distributions to describe rock fragmentation data
JA Sanchidrián, F Ouchterlony, P Moser, P Segarra, LM López
International Journal of Rock Mechanics and Mining Sciences 53, 18-31, 2012
452012
Ecosystem services costs of metal mining and pressures on biomes
M Tost, D Murguia, M Hitch, S Lutter, S Luckeneder, S Feiel, P Moser
The Extractive Industries and Society 7 (1), 79-86, 2020
362020
Less fines production in aggregate and industrial minerals industry
P Moser
Proc EFEE 2^< nd> World Conf Expl & Blasting Techn, Balkema 2003, 335-343, 2003
352003
Continuum modelling of dynamic behaviour and fragmentation of quasi‐brittle materials: application to rock fragmentation by blasting
A Rouabhi, M Tijani, P Moser, D Goetz
International journal for numerical and analytical methods in geomechanics …, 2005
322005
The importance of research on alternative and hybrid rock extraction methods
NA Sifferlinger, P Hartlieb, P Moser
BHM berg-und Hüttenmännische Monatshefte 162 (2), 58-66, 2017
312017
Comparison of the blast fragmentation from lab-scale and full-scale tests at Bararp
P Moser
Proc EFEE 2^< nd> World Conf Expl & Blasting Techn, Balkema 2003, 449-458, 2003
312003
Carbon prices for meeting the Paris agreement and their impact on key metals
M Tost, M Hitch, S Lutter, S Feiel, P Moser
The Extractive Industries and Society 7 (2), 593-599, 2020
292020
Less Fines in aggregate and industrial minerals production-Results of an European research project.
P Moser
3rd EFEE World Conference of Explosives and Blasting, 567-574, 2005
232005
The license to mine: Making resource wealth work for those who need it most
AJ Hagan, M Tost, OR Inderwildi, M Hitch, P Moser
Resources Policy 74, 101418, 2021
212021
Tools for teaching mining students in virtual reality based on 360 video experiences
D Kalkofen, S Mori, T Ladinig, L Daling, A Abdelrazeq, M Ebner, M Ortega, ...
2020 IEEE Conference on Virtual Reality and 3D User Interfaces Abstracts and …, 2020
212020
Carbon capture and utilization (CCU)–Verfahrenswege und deren Bewertung
M Lehner, M Ellersdorfer, R Treimer, P Moser, V Theodoridou, ...
BHM Berg-und Hüttenmännische Monatshefte 157 (2), 63-69, 2012
212012
Evaluation of some distribution functions for describing rock fragmentation data
JA Sanchidrián, P Segarra, LM López, F Ouchterlony, P Moser
International Symposium on Rock Fragmentation by Blasting: 13/09/2009-17/09 …, 2009
212009
Järjestelmä ei voi suorittaa toimenpidettä nyt. Yritä myöhemmin uudelleen.
Artikkelit 1–20