Matthieu van der Heijden
Matthieu van der Heijden
Associate Professor in Supply Chain Management and Service Logistics, University of Twente, The Netherlands
Verified email at utwente.nl
Title
Cited by
Cited by
Year
Comparison of agent-based scheduling to look-ahead heuristics for real-time transportation problems
M Mes, M Van Der Heijden, A Van Harten
European journal of operational research 181 (1), 59-75, 2007
1882007
On the availability of a k-out-of-N system given limited spares and repair capacity under a condition based maintenance strategy
KS de Smidt-Destombes, MC van der Heijden, A van Harten
Reliability engineering & System safety 83 (3), 287-300, 2004
1612004
Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems
A Sleptchenko, MC van der Heijden, A van Harten
International Journal of Production Economics 79 (3), 209-230, 2002
1582002
On the interaction between maintenance, spare part inventories and repair capacity for a k-out-of-N system with wear-out
KS de Smidt-Destombes, MC van der Heijden, A Van Harten
European Journal of Operational Research 174 (1), 182-200, 2006
1132006
Stock allocation in general multi-echelon distribution systems with (< i> R, S</i>) order-up-to-policies
MC Van der Heijden, EB Diks, AG De Kok
International Journal of Production Economics 49 (2), 157-174, 1997
1111997
Using repair priorities to reduce stock investment in spare part networks
A Sleptchenko, MC van der Heijden, A van Harten
European Journal of Operational Research 163 (3), 733-750, 2005
972005
Trade-off between inventory and repair capacity in spare part networks
A Sleptchenko, MC van der Heijden, A van Harten
Journal of the Operational Research Society 54 (3), 263-272, 2003
912003
Joint optimisation of spare part inventory, maintenance frequency and repair capacity for k-out-of-N systems
KS de Smidt-Destombes, MC van der Heijden, A van Harten
International Journal of Production Economics 118 (1), 260-268, 2009
892009
Joint optimization of level of repair analysis and spare parts stocks
RJI Basten, MC Van der Heijden, JMJ Schutten
European journal of operational research 222 (3), 474-483, 2012
822012
Selecting parts for additive manufacturing in service logistics
N Knofius, MC Van der Heijden, WHM Zijm
Journal of manufacturing technology management, 2016
782016
Availability of k-out-of-N systems under block replacement sharing limited spares and repair capacity
KS de Smidt-Destombes, MC van der Heijden, A van Harten
International Journal of Production Economics 107 (2), 404-421, 2007
752007
An efficient model formulation for level of repair analysis
RJI Basten, JMJ Schutten, MC Van Der Heijden
Annals of Operations Research 172 (1), 119, 2009
652009
Scheduling vehicles in automated transportation systems Algorithms and case study
M van der Heijden, M Ebben, N Gademann, A van Harten
OR spectrum 24 (1), 31-58, 2002
62*2002
Supply rationing in multi-echelon divergent systems
MC van der Heijden
European Journal of Operational Research 101 (3), 532-549, 1997
611997
An exact solution for the state probabilities of the multi-class, multi-server queue with preemptive priorities
A Sleptchenko, A Van Harten, M van der Heijden
Queueing Systems 50 (1), 81-107, 2005
55*2005
An approximate approach for the joint problem of level of repair analysis and spare parts stocking
RJI Basten, MC van der Heijden, JMJ Schutten, E Kutanoglu
Annals of Operations Research, 1-25, 2011
48*2011
Last time buy and repair decisions for spare parts
S Behfard, MC van der Heijden, A Al Hanbali, WHM Zijm
European Journal of Operational Research 244 (2), 498-510, 2015
462015
A minimum cost flow model for level of repair analysis
RJI Basten, MC Van der Heijden, JMJ Schutten
International Journal of Production Economics 133 (1), 233-242, 2011
452011
Dynamic transport scheduling under multiple resource constraints
MJR Ebben, MC Van der Heijden, A Van Harten
European Journal of Operational Research 167 (2), 320-335, 2005
442005
Near cost-optimal inventory control policies for divergent networks under fill rate constraints
M van der Heijden
International Journal of Production Economics 63 (2), 161-179, 2000
442000
The system can't perform the operation now. Try again later.
Articles 1–20