Evaluation of alternative contracting techniques on FDOT construction projects RD Ellis Jr, JH Pyeon, ZJ Herbsman, E Minchin, K Molenaar
96 2007 Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects K Choi, YH Kwak, JH Pyeon, K Son
Journal of construction engineering and management 138 (3), 323-330, 2012
44 2012 Construction cost estimation using a case-based reasoning hybrid genetic algorithm based on local search method S Jung, JH Pyeon, HS Lee, M Park, I Yoon, J Rho
Sustainability 12 (19), 7920, 2020
20 2020 Effectiveness study of methods for removing temporary pavement markings in roadway construction zones Y Cho, K Kabassi, JH Pyeon, K Choi, C Wang, T Norton
Journal of construction engineering and management 139 (3), 257-266, 2013
19 2013 Blockchain-based network concept model for reliable and accessible fine dust management system at construction sites S Cho, M Khan, J Pyeon, C Park
Applied Sciences 11 (18), 8686, 2021
18 2021 A study of simulation-based contract incentives and disincentives usage RD Ellis, JH Pyeon
Construction Research Congress 2005: Broadening Perspectives, 1-10, 2005
16 2005 Development of improved 4D CAD system for horizontal works in civil engineering projects L Kang, J Pyeon, H Moon, C Kim, M Kang
Journal of computing in civil engineering 27 (3), 212-230, 2013
15 2013 Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance JH Pyeon
University of Florida, 2005
10 2005 Improving Transportation Construction Project Performance: Development of a Model to Support the Decision-Making Process for Incentive/Disincentive Construction Projects, MTI … JH Pyeon, T Park
9 2010 Analyzing the potential of hybrid and electric off-road equipment in reducing carbon emissions from construction industries M Holian, JH Pyeon
8 2017 Systematic Procedures to Determine Incentive/Disincentive Dollar Amounts for Highway Transportation Construction Projects, Research Report 11-22 JH Pyeon, EB Lee
7 2012 Evaluation of seal coating treatments to manage temporary pavement paint markings during highway construction RD Ellis, JH Pyeon, SH Lee, B Kim
KSCE Journal of Civil Engineering 14, 461-471, 2010
7 2010 Cost estimate modeling of transportation management plans for highway projects JH Pyeon, EB Lee, RD Ellis, T Park
Mineta Transportation Institute, 2012
6 2012 Coarsening model of cavity nucleation and thin film delamination from single-crystal with proton implantation JW Hong, JH Pyeon, JW Tedesco, YB Park
Physical Review B 75 (21), 214102, 2007
6 2007 A framework for post-disaster facility restoration management: needs and requirements for the use of hybrid simulation M Park, SH Lee, HS Lee, M Choi, S Hwang, MG Moon, S Lee, JH Pyeon
Construction Research Congress 2014: Construction in a Global Network, 1269-1278, 2014
5 2014 A method of assigning weight values for qualitative attributes in CBR cost model HS Lee, SY Kim, MS Park, SH Ji, KH Seong, JH Pyeon
Korean Journal of Construction Engineering and Management 12 (1), 53-61, 2011
5 2011 Traffic Impact on Incentive Contracting Project Time Performance during Highway Construction JH Pyeon
Journal of Civil Engineering and Architecture 4 (7), 9-14, 2010
3 2010 Trend Analysis of Long Tunnels Worldwide JH Pyeon
2 2016 Proposed methodology for dynamic schedule compression J Lee, RD Ellis, JH Pyeon
2007 IEEE International Conference on Automation Science and Engineering …, 2007
2 2007 Hazardous Area Identification Model Using Automated Data Collection (ADC) based on BIM HS Kim, HS Lee, MS Park, KP Lee, JH Pyeon
Korean Journal of Construction Engineering and Management 11 (6), 14-23, 2010
1 2010