Mohamed Al-Hussein
Mohamed Al-Hussein
Professor
Verified email at ualberta.ca
Title
Cited by
Cited by
Year
Development of lean model for house construction using value stream mapping
H Yu, T Tweed, M Al-Hussein, R Nasseri
Journal of construction engineering and management 135 (8), 782-790, 2009
1762009
Integrating 3D visualization and simulation for tower crane operations on construction sites
M Al-Hussein, MA Niaz, H Yu, H Kim
Automation in construction 15 (5), 554-562, 2006
1722006
BIM-based integrated approach for detailed construction scheduling under resource constraints
H Liu, M Al-Hussein, M Lu
Automation in Construction 53, 29-43, 2015
1522015
Lean transformation in a modular building company: A case for implementation
H Yu, M Al-Hussein, S Al-Jibouri, A Telyas
Journal of management in engineering 29 (1), 103-111, 2013
1282013
Optimization algorithm for selection and on site location of mobile cranes
M Al-Hussein, S Alkass, O Moselhi
Journal of construction engineering and management 131 (5), 579-590, 2005
1192005
Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation
HX Li, M Al-Hussein, Z Lei, Z Ajweh
Canadian Journal of Civil Engineering 40 (12), 1184-1195, 2013
942013
Building information modelling for off-site construction: Review and future directions
X Yin, H Liu, Y Chen, M Al-Hussein
Automation in Construction 101, 72-91, 2019
882019
Automated post-simulation visualization of modular building production assembly line
SH Han, M Al-Hussein, S Al-Jibouri, H Yu
Automation in construction 21, 229-236, 2012
852012
A methodology for mobile crane lift path checking in heavy industrial projects
Z Lei, H Taghaddos, U Hermann, M Al-Hussein
Automation in Construction 31, 41-53, 2013
752013
Monitoring building energy consumption, thermal performance, and indoor air quality in a cold climate region
T Sharmin, M Gül, X Li, V Ganev, I Nikolaidis, M Al-Hussein
Sustainable Cities and Society 13, 57-68, 2014
712014
Nanohybridization of molybdenum oxide with tungsten molybdenum oxide nanowires for solution-processed fully reversible switching of energy storing smart windows
H Li, L McRae, CJ Firby, M Al-Hussein, AY Elezzabi
Nano Energy 47, 130-139, 2018
702018
An automated biomechanical simulation approach to ergonomic job analysis for workplace design
A Golabchi, SH Han, JO Seo, SU Han, SH Lee, M Al-Hussein
Journal of Construction Engineering and Management 141 (8), 04015020, 2015
702015
Integrated production planning and control system for a panelized home prefabrication facility using simulation and RFID
MS Altaf, A Bouferguene, H Liu, M Al-Hussein, H Yu
Automation in construction 85, 369-383, 2018
662018
Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industry
H Liu, M Lu, M Al-Hussein
Advanced Engineering Informatics 30 (2), 190-207, 2016
642016
An algorithm for mobile crane selection and location on construction sites
M Al‐Hussein, S Alkass, O Moselhi
Construction Innovation, 2001
632001
Evolution of the crane selection and on-site utilization process for modular construction multilifts
J Olearczyk, M Al-Hussein, A Bouferguène
Automation in construction 43, 59-72, 2014
582014
Productivity and CO2 emission analysis for tower crane utilization on high-rise building projects
S Hasan, A Bouferguene, M Al-Hussein, P Gillis, A Telyas
Automation in Construction 31, 255-264, 2013
492013
Utilization of 3D visualization of mobile crane operations for modular construction on-site assembly
SH Han, S Hasan, A Bouferguène, M Al-Hussein, J Kosa
Journal of management in engineering 31 (5), 04014080, 2015
482015
Ergonomic analysis and the need for its integration for planning and assessing construction tasks
N Inyang, M Al-Hussein, M El-Rich, S Al-Jibouri
Journal of Construction Engineering and Management 138 (12), 1370-1376, 2012
472012
BIM approach for automated drafting and design for modular construction manufacturing
A Alwisy, M Al-Hussein, SH Al-Jibouri
Computing in civil engineering (2012), 221-228, 2012
472012
The system can't perform the operation now. Try again later.
Articles 1–20