Follow
Jaakko Peltokorpi
Jaakko Peltokorpi
Aalto University, Department of Mechanical Engineering
Verified email at aalto.fi
Title
Cited by
Cited by
Year
Effects of group size and learning on manual assembly performance: an experimental study
J Peltokorpi, E Niemi
International Journal of Production Research 57 (2), 452-469, 2019
242019
Adjustment for cognitive interference enhances the predictability of the power learning curve
MY Jaber, J Peltokorpi, CH Glock, EH Grosse, M Pusic
International Journal of Production Economics 234, 108045, 2021
212021
A group learning curve model with motor, cognitive and waste elements
J Peltokorpi, MY Jaber
Computers & Industrial Engineering 146, 106621, 2020
152020
Interference-adjusted power learning curve model with forgetting
J Peltokorpi, MY Jaber
International Journal of Industrial Ergonomics 88, 103257, 2022
102022
Graph-based analysis of metal cutting parameters
S Laakso, J Peltokorpi, J Ratava, M Lohtander, J Varis
Advances in Sustainable and Competitive Manufacturing Systems: 23rd …, 2013
102013
The lot size problem and the learning curve: A review of mathematical modeling (1950’s-2020)
MY Jaber, J Peltokorpi, TL Smunt
Applied Mathematical Modelling 105, 832-859, 2022
92022
Analysis of the effects of group size and learning on manual assembly performance
J Peltokorpi, E Niemi
Procedia Manufacturing 39, 964-973, 2019
92019
QR code-based material flow monitoring in a subcontractor manufacturer network
J Peltokorpi, L Isojärvi, K Häkkinen, E Niemi
Procedia Manufacturing 55, 110-115, 2021
82021
Worker coordination policies in parallel station systems: performance models for a set of jobs and for continuous arrival of jobs
J Peltokorpi, H Tokola, E Niemi
International Journal of Production Research 53 (6), 1625-1641, 2015
82015
An interference-adjusted power learning curve for tasks with cognitive and motor elements
J Peltokorpi, MY Jaber
Applied Mathematical Modelling 101, 157-170, 2022
72022
The effects of learning in production and group size on the lot-sizing problem
MY Jaber, J Peltokorpi
Applied Mathematical Modelling 81, 419-427, 2020
72020
Differences between worker pairs in manual assembly: a case study
J Peltokorpi, E Niemi
Procedia Manufacturing 25, 535-542, 2018
62018
Manual assembly learning, disability, and instructions: an industrial experiment
J Peltokorpi, S Hoedt, T Colman, K Rutten, EH Aghezzaf, J Cottyn
International Journal of Production Research 61 (22), 7903-7921, 2023
42023
Effective relationships of factors in a manual assembly line environment
J Peltokorpi, M Lohtander, SVA Laakso
International Journal of Engineering Management and Economics 4 (3-4), 267-290, 2014
32014
Comparison of balancing policies in multi-item assembly
J Peltokorpi, H Tokola, E Niemi
International Conference on Flexible Automation and Intelligent …, 2012
32012
Relationships of factors in a manual assembly line environment
J Peltokorpi, S Laakso, J Ratava, M Lohtander, J Varis
Advances in Sustainable and Competitive Manufacturing Systems: 23rd …, 2013
22013
Potential Models of Group Learning in Production
J Peltokorpi, MY Jaber
SPS2020, 205-216, 2020
12020
Worker Coordination, Collaboration and Learning in Make-to-order Assembly Production
J Peltokorpi
Aalto University, 2018
12018
Comparing worker coordination policies in parallel station systems with different worker skill level distributions
J Peltokorpi, E Niemi, H Tokola
25th International Conference on Flexible Automation & Intelligent …, 2015
12015
Economic order/production quantity (EOQ/EPQ) models with product recovery: A review of mathematical modeling (1967–2022)
MY Jaber, J Peltokorpi
Applied Mathematical Modelling 129, 655-672, 2024
2024
The system can't perform the operation now. Try again later.
Articles 1–20