Follow
Kaushik Dey
Kaushik Dey
Associate Professor, Mining Engineering, IIT Kharagpur
Verified email at mining.iitkgp.ac.in
Title
Cited by
Cited by
Year
Prediction of blast-induced overbreak from uncontrolled burn-cut blasting in tunnels driven through medium rock class
K Dey, V Murthy
Tunnelling and Underground Space Technology 28, 49-56, 2012
582012
Concept of blastability-an update
K Dey, P Sen
452003
Predicting" cuttability" with surface miners-A rockmass classification approach
K Dey, AK Ghosh
412008
Prediction of overbreak in underground tunnel blasting: a case study
V Murthy, K Dey, R Raitani
Canadian Tunnelling Association, 2003
352003
Estimation of near-field peak particle velocity: A mathematical model
S Arora, K Dey
Journal of Geology and Mining Research 2 (4), 68-73, 2010
312010
Coal Mine Water Drainage: The Current Status and Challenges
SRK Dey
Journal of Institute of Engineers : Series D, 2020
252020
Predicting overbreak from blast vibration monitoring in a lake tap tunnel–a success story
V Murthy, K Dey
Fragblast 7 (3), 149-166, 2003
252003
Review of cuttability indices and a new rockmass classification approach for selection of surface miners
K Dey, AK Ghose
Rock mechanics and rock engineering 44, 601-611, 2011
222011
Real option valuation of an Indian iron ore deposit through system dynamics model
T Hazra, B Samanta, K Dey
Resources Policy 60, 288-299, 2019
202019
Investigation of blast-induced rock damage and development of predictive models in horizontal drivages
K Dey
Unpublished Ph. D. thesis in Indian School of Mines. Dhanbad. Hal, 45-103, 2004
172004
Operation of surface miner: retrospect of a decade journey in India
K Dey, J Bhattacharya
Procedia Engineering 46, 97-104, 2012
152012
Assessment of metal contamination and the associated human health risk from dustfall deposition: a study in a mid-sized town in India
N Rani, BS Sastry, K Dey
Environmental Science and Pollution Research 26, 23173-23191, 2019
142019
Determining blast damage envelope through vibration model and validation using seismic imaging
K Dey, V Murthy
Mining Technology 120 (2), 90-94, 2011
132011
Rock cutting with surface miner – A computational approach
PP Dey K.
Journal of Technology and Engineering Research 16 (September), 115-121, 2009
11*2009
Environmental acceptability of Wirtgen Surface Miner for Indian surface coal mines
K Dey, K Pathak, P Sen
National Seminar on Mining in the New Millennium 10-12 November 2000 …, 2000
102000
Performance Analysis of Continuous Surface Miner in Indian Surface Coal Mine–A case Study
K Dey
Unpublished M. Tech Dissertation submitted to Indian School of Mines …, 1999
91999
Productivity improvement through selection of operating mode of surface miner: comparative approach
P Pradhan, K Dey
Journal of Mines, Metals and Fuels 57 (3 and 4), 67 - 75, 2009
82009
Selecting a surface miner—an algorithm
K Dey, AK Ghose
Mining Industry Annual Review for, 282-286, 2009
82009
Tunnel Blast Design using Artificial Neural Network – A Case Study
DKRRC Murthy V.M.S.R.
Journal of Institute of Engineers : Series D 86 (1), 39 - 45, 2006
7*2006
Selection of optimum mode of continuous surface miner operation-A methodology
K Dey, P Sen
Indian Mining and Engineering Journal 40, 2001
72001
The system can't perform the operation now. Try again later.
Articles 1–20