Microstructure and mechanical properties of gypsum composites reinforced with recycled cellulose pulp MA Carvalho, C Calil Júnior, H Savastano Junior, R Tubino, MT Carvalho Materials Research 11, 391-397, 2008 | 79 | 2008 |
Prioritizing construction risks using fuzzy AHP in Brazilian public enterprises LMP Beltrão, MTM Carvalho Journal of Construction Engineering and Management 145 (2), 05018018, 2019 | 57 | 2019 |
Metodologia para avaliação da sustentabilidade de habitações de interesse social com foco no projeto MTM Carvalho, RM Sposto Ambiente Construído 12, 207-225, 2012 | 57 | 2012 |
Operational energy of opaque ventilated façades in Brazil ACF Maciel, MT Carvalho Journal of Building Engineering 25, 100775, 2019 | 56 | 2019 |
Prioritization of risks related to BIM implementation in brazilian public agencies using fuzzy logic VLB Viana, MTM Carvalho Journal of Building Engineering 36, 102104, 2021 | 30 | 2021 |
TG and DSC studies on plaster residues as recycled material M Carvalho, M Leles, R Tubino Journal of thermal analysis and calorimetry 91 (2), 621-625, 2008 | 24 | 2008 |
Numerical analysis of historic structural elements using 3D point cloud data U Almac, IP Pekmezci, M Ahunbay The Open Construction & Building Technology Journal 10 (1), 2016 | 20 | 2016 |
How different tools contribute to climate change mitigation in a circular building environment?—a Systematic Literature Review LR Caldas, MV Silva, VP Silva, MTM Carvalho, RD Toledo Filho Sustainability 14 (7), 3759, 2022 | 19 | 2022 |
Construction cost estimation of Brazilian highways using artificial neural networks LB Barros, M Marcy, MTM Carvalho International Journal of Structural and Civil Engineering Research 7 (3 …, 2018 | 19 | 2018 |
Avaliação de estratégias para a mitigação dos impactos ambientais de revestimentos argamassados no Brasil LR Caldas, MTM Carvalho, RD Toledo Filho Ambiente Construído 20, 343-362, 2020 | 14 | 2020 |
Gerenciamento de obras públicas MTM Carvalho, JMP de Paula, PH Gonçalves Texto para Discussão, 2017 | 14 | 2017 |
Caracterização da utilização do BIM no Distrito Federal FVF Carmona, MTM Carvalho Ambiente construído 17, 385-401, 2017 | 12 | 2017 |
Aplicação do Gerenciamento de Tempo conforme o Guia PMBOK® em empreendimento habitacional em Brasília MTM Carvalho, MB Azevedo Revista Gestão da Produção Operações e Sistemas, 113-113, 2013 | 11 | 2013 |
Recommendations and guidelines for implementing PPP projects: Case of the electricity sector in Brazil LG Araujo, ABS Piña, LAG Aidar, GO Coelho, MTM Carvalho Built environment project and asset management 9 (2), 262-276, 2019 | 10 | 2019 |
Methodology used to investigate the energy savings of opaque ventilated façades in residential buildings in Brazil ACF Maciel, MT Carvalho MethodsX 8, 101227, 2021 | 9 | 2021 |
Study of delays in constructions: a managerial point of view of private companies in Brasilia, Brazil ELG Almeida, VAS Feitoza, MTM Carvalho, ABS Piña, LG Araújo, ... Gestão & Produção 28, e5194, 2021 | 8 | 2021 |
Diagnóstico da produção científica relacionada à aplicação do BIM à metodologia de avaliação do ciclo de vida (ACV) LR Caldas, MLM Nascimento, MTM Carvalho, RM Sposto IBERO-LATIN AMERICAN CONGRESS ON COMPUTATIONAL METHODS IN ENGINEERING 36, 2015 | 8 | 2015 |
Uma Estratégia para o Desenvolvimento de Aplicações Configuráveis em Mecânica Computacional MT Carvalho Tese de Doutorado, PUC-Rio, Rio de Janeiro, RJ, Brasil, 1995 | 8 | 1995 |
Integration between BIM and EPDs: Evaluation of the main difficulties and proposal of a framework based on ISO 19650: 2018 R Almeida, L Chaves, M Silva, M Carvalho, L Caldas Journal of Building Engineering 68, 106091, 2023 | 7 | 2023 |
Gerenciamento de obras públicas e as políticas de infraestrutura do Brasil contemporâneo MTM Carvalho, JMP Paula, PH Gonçalves Instituto de Pesquisa Econômica Aplicada (Ipea), 2018 | 7 | 2018 |