Botond Kádár
Botond Kádár
MTA SZTAKI
Vahvistettu sähköpostiosoite verkkotunnuksessa sztaki.hu
Nimike
Viittaukset
Viittaukset
Vuosi
Cyber-physical systems in manufacturing
L Monostori, B Kádár, T Bauernhansl, S Kondoh, S Kumara, G Reinhart, ...
Cirp Annals 65 (2), 621-641, 2016
10162016
Hierarchy in distributed shop floor control
L Bongaerts, L Monostori, D McFarlane, B Kadar
Computers in Industry 43 (2), 123-137, 2000
2142000
Stability-oriented evaluation of rescheduling strategies, by using simulation
A Pfeiffer, B Kádár, L Monostori
Computers in Industry 58 (7), 630-643, 2007
962007
Semantic Virtual Factory supporting interoperable modelling and evaluation of production systems
B Kádár, W Terkaj, M Sacco
CIRP Annals 62 (1), 443-446, 2013
772013
Enhanced control of complex production structures by tight coupling of the digital and the physical worlds
B Kádár, A Lengyel, L Monostori, Y Suginishi, A Pfeiffer, Y Nonaka
CIRP annals 59 (1), 437-440, 2010
672010
Discrete event simulation for supporting production planning and scheduling decisions in digital factories
B Kádár, A Pfeiffer, L Monostori
Proceedings of the 37th CIRP international seminar on manufacturing systems …, 2004
592004
Solution approaches to real-time control of customized mass production
L Monostori, B Kádár, A Pfeiffer, D Karnok
CIRP annals 56 (1), 431-434, 2007
542007
Approaches to managing changes and uncertainties in manufacturing
L Monostori, B Kádár, J Hornyák
CIRP Annals 47 (1), 365-368, 1998
541998
Management of changes and disturbances in manufacturing systems
L Monostori, E Szelke, B Kádár
Annual Reviews in Control 22, 85-97, 1998
531998
Towards adaptive and digital manufacturing
L Monostori, BC Csáji, B Kádár, A Pfeiffer, E Ilie-Zudor, Z Kemény, ...
Annual reviews in Control 34 (1), 118-128, 2010
432010
Hierarchy in distributed shop floor control
L Bongaerts, L Monostori, D McFarlane, B Kádár
EPFL, 1998
431998
Reinforcement learning in a distributed market-based production control system
BC Csáji, L Monostori, B Kádár
Advanced Engineering Informatics 20 (3), 279-288, 2006
412006
Capacity management for assembly systems with dedicated and reconfigurable resources
D Gyulai, B Kádár, A Kovács, L Monostori
CIRP Annals 63 (1), 457-460, 2014
392014
Digital enterprise solution for integrated production planning and control
L Monostori, G Erdős, B Kádár, T Kis, A Kovács, A Pfeiffer, J Váncza
Computers in Industry 61 (2), 112-126, 2010
372010
Simulation model study for manufacturing effectiveness evaluation in crowdsourced manufacturing
T Kaihara, Y Katsumura, Y Suginishi, B Kadar
CIRP Annals 66 (1), 445-448, 2017
322017
Adaptation and learning in distributed production control
L Monostori, BC Csáji, B Kádár
CIRP Annals 53 (1), 349-352, 2004
302004
Manufacturing lead time estimation with the combination of simulation and statistical learning methods
A Pfeiffer, D Gyulai, B Kádár, L Monostori
Procedia CIRP 41, 75-80, 2016
282016
Improving multi-agent based scheduling by neurodynamic programming
BC Csáji, B Kádár, L Monostori
International Conference on Industrial Applications of Holonic and Multi …, 2003
262003
Evaluating and improving production control systems by using emulation
A Pfeiffer, B Kádár, L Monostori
Applied Simulation and Modelling, 2003
232003
Agent-based control of manufacturing systems
L Monostori, B Kádár
Proceedings of the Second International Conference on Intelligent Processing …, 1999
231999
Järjestelmä ei voi suorittaa toimenpidettä nyt. Yritä myöhemmin uudelleen.
Artikkelit 1–20