The energy scheduling problem: Industrial case-study and constraint propagation techniques C Artigues, P Lopez, A Haït International Journal of Production Economics 143 (1), 13-23, 2013 | 126 | 2013 |
Project scheduling under uncertainty using fuzzy modelling and solving techniques M Masmoudi, A Hait Engineering Applications of Artificial Intelligence 26 (1), 135-149, 2013 | 112 | 2013 |
Integrated production and utility system approach for optimizing industrial unit operations MH Agha, R Thery, G Hetreux, A Hait, JM Le Lann Energy 35 (2), 611-627, 2010 | 109 | 2010 |
On electrical load tracking scheduling for a steel plant A Hait, C Artigues Computers & Chemical Engineering 35 (12), 3044-3047, 2011 | 66 | 2011 |
Gestion de production et ressources humaines: méthodes de planification dans les systèmes productifs P Baptiste Presses inter Polytechnique, 2005 | 51 | 2005 |
Motion planning on rough terrain for an articulated vehicle in presence of uncertainties A Hait, T Simeon Proceedings of IEEE/RSJ International Conference on Intelligent Robots and …, 1996 | 51 | 1996 |
A hybrid CP/MILP method for scheduling with energy costs A Hait, C Artigues European Journal of Industrial Engineering 5 (4), 471-489, 2011 | 46 | 2011 |
Robust motion planning for rough terrain navigation A Haït, T Siméon, M Taïx Proceedings 1999 IEEE/RSJ International Conference on Intelligent Robots and …, 1999 | 40 | 1999 |
A rough-cut capacity planning model with overlapping G Baydoun, A Haït, R Pellerin, B Clément, G Bouvignies OR spectrum 38, 335-364, 2016 | 36 | 2016 |
Algorithms for rough terrain trajectory planning A Haït, T Simeon, M Taïx Advanced Robotics 16 (8), 673-699, 2002 | 27 | 2002 |
Scheduling under energy constraints C Artigues, P Lopez, A Haït International Conference on Industrial Engineering and Systems Management …, 2009 | 25 | 2009 |
A novel solution approach with ML-based pseudo-cuts for the Flight and Maintenance Planning problem F Peschiera, R Dell, J Royset, A Haït, N Dupin, O Battaïa OR Spectrum 43, 635-664, 2021 | 22 | 2021 |
The extended resource task network: a framework for the combined scheduling of batch processes and CHP plants R Théry, G Hetreux, MH Agha, A Haït, JM Le Lann International Journal of Production Research 50 (3), 623-646, 2012 | 18 | 2012 |
Fuzzy uncertainty modelling for project planning: application to helicopter maintenance M Masmoudi, A Haït International journal of production research 50 (13), 3594-3611, 2012 | 16 | 2012 |
A new event-based MILP model for the resource-constrained project scheduling problem with variable intensity activities A Haït, G Baydoun The IEEE international conference on industrial engineering and engineering …, 2012 | 15 | 2012 |
Proactive tactical planning approach for large scale engineering and construction projects K Cherkaoui, P Baptiste, R Pellerin, A Haït, N Perrier The Journal of Modern Project Management 5 (1), 2017 | 12 | 2017 |
Long term planning of military aircraft flight and maintenance operations F Peschiera, O Battaïa, A Haït, N Dupin arXiv preprint arXiv:2001.09856, 2020 | 11 | 2020 |
A time driven RCCP model with two levels of planning and a reactive planning approach for tactical project planning K Cherkaoui, R Pellerin, P Baptiste, A Haït Procedia Computer Science 64, 257-264, 2015 | 11 | 2015 |
A GA-based fuzzy resource leveling optimization for helicopter maintenance activity M Masmoudi, A Haït Proceedings of the 7th Conference of the European Society for Fuzzy Logic …, 2011 | 11 | 2011 |
A tactical model under uncertainty for helicopter maintenance planning M Masmoudi, A Haït the 8th ENIM IFAC International Conference of Modeling and Simulation, MOSIM …, 2010 | 11 | 2010 |