Follow
S S Panwalkar
S S Panwalkar
Verified email at jhu.edu
Title
Cited by
Cited by
Year
A survey of scheduling rules
SS Panwalkar, W Iskander
Operations research 25 (1), 45-61, 1977
18661977
Common due date assignment to minimize total penalty for the one machine scheduling problem
SS Panwalkar, ML Smith, A Seidmann
Operations research 30 (2), 391-399, 1982
5531982
The lessons of flowshop scheduling research
RA Dudek, SS Panwalkar, ML Smith
Operations Research 40 (1), 7-13, 1992
3111992
Sequencing research and the industrial scheduling problem
SS Panwalkar, RA Dudek, ML Smith
Symposium on the Theory of Scheduling and its Applications, 29-38, 1973
2631973
Optimal assignment of due-dates for a single processor scheduling problem
A Seidmann, SS Panwalkar, ML Smith
The International Journal Of Production Research 19 (4), 393-399, 1981
2381981
Common due window size and location determination in a single machine scheduling problem
SD Liman, SS Panwalkar, S Thongmee
Journal of the Operational Research Society 49, 1007-1010, 1998
1671998
Single-machine sequencing with controllable processing times
SS Panwalkar, R Rajagopalan
European Journal of Operational Research 59 (2), 298-302, 1992
1271992
A heuristic for the single machine tardiness problem
SS Panwalkar, ML Smith, CP Koulamas
European Journal of Operational Research 70 (3), 304-310, 1993
1191993
Flowshop sequencing problem with ordered processing time matrices
ML Smith, SS Panwalkar, RA Dudek
Management Science 21 (5), 544-549, 1975
1071975
Scheduling in a two-stage manufacturing process
SL NARASTMHAN, SS PANWALKAR
THE INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 22 (4), 555-564, 1984
941984
Determination of common due window location in a single machine scheduling problem
SD Liman, SS Panwalkar, S Thongmee
European Journal of Operational Research 93 (1), 68-74, 1996
871996
Scheduling of a two-machine flowshop with travel time between machines
SS Panwalkar
Journal of the operational Research Society 42, 609-613, 1991
771991
Flowshop sequencing problem with ordered processing time matrices: A general case
ML Smith, SS Panwalkar, RA Dudek
Naval Research Logistics Quarterly 23 (3), 481-486, 1976
611976
Review of the ordered and proportionate flow shop scheduling research
SS Panwalkar, ML Smith, C Koulamas
Naval Research Logistics (NRL) 60 (1), 46-55, 2013
582013
An ordered flow-shop sequencing problem with mean completion time criterion
SS Panwalkar, AW Khan
The International Journal of Production Research 14 (5), 631-635, 1976
521976
A single machine scheduling problem with common due window and controllable processing times
SD Liman, SS Panwalkar, S Thongmee
Annals of Operations Research 70 (0), 145-154, 1997
491997
Ordered flow shop problems with no in-process waiting: Further results
SS Panwalkar, CR Woollam
Journal of the Operational Research Society 31 (11), 1039-1043, 1980
421980
Flow shop scheduling problems with no in-process waiting: a special case
SS Panwalkar, CR Woollam
Journal of the Operational Research Society, 661-664, 1979
381979
Use of a case study in sequencing/scheduling research
RA Dudek, ML Smith, SS Panwalkar
Omega 2 (2), 253-261, 1974
331974
Single stage minimum absolute lateness problem with a common due date on non-identical machines
B Alidaee, SS Panwalkar
Journal of the Operational Research Society 44, 29-36, 1993
321993
The system can't perform the operation now. Try again later.
Articles 1–20