Follow
Horng-Chyi Horng
Horng-Chyi Horng
朝陽科技大學工業工程與管理系副教授
Verified email at cyut.edu.tw - Homepage
Title
Cited by
Cited by
Year
Dynamic dispatching rule-pairs for multitasking workers in JIT production systems
JK Cochran, HC Horng
International journal of production research 37 (10), 2175-2190, 1999
141999
Project surface regions: a decision support methodology for multitasking workers assignment in JIT systems
HC Horng, JK Cochran
Computers & industrial engineering 39 (1-2), 159-171, 2001
132001
Comparing steady-state performance of dispatching rule-pairs in open shops
HC Horng
International Journal of Applied Science and Engineering 4 (3), 259-273, 2006
92006
A new performance indicator of material flow for production systems
CS Liu, LY Lin, MC Chen, HC Horng
Procedia Manufacturing 11, 1774-1781, 2017
82017
Invariant 2D object recognition using KRA and GRA
TH Sun, HC Horng, CS Liu, FC Tien
Expert Systems with applications 36 (9), 11517-11527, 2009
82009
A modified imperfect preventive maintenance policy considering failure replacement
M Chen, M Wang, HC Horng
Journal of the Chinese Institute of Industrial Engineers 27 (1), 37-43, 2010
62010
Optimizing the multitasking of workers in just-in-time systems
HC Horng
Arizona State University, 1996
41996
Constructing Norm Curves for the Functional Movement Capacity of Sub-healthy Adults via SMARC-a Case Study in Taiwan
HC Horng, YT Chen, HH Liu
Proceedings of the 2019 International Conference on Management Science and …, 2019
32019
Optimal safety stock policy for a hybrid manufacturing system: a simulation study
HC Horng
Advances in Sustainable and Competitive Manufacturing Systems: 23rd …, 2013
22013
Health Improvement for the Functional Movement Capacity of Sub-healthy Adults
YT Chen, HC Horng, HH Liu
Proceedings of the 2021 3rd International Conference on Management Science …, 2021
12021
Integrating Production Assessment with PPAP–A QFD Approach
CS Liu, HC Horng
Proceedings–3rd European IEOM Pilsen Conference, 2019
12019
Further Analysis on the Health Improvement for the Functional Movement Capacity of Sub-healthy Adults
YT Chen, HC Horng
Proceedings of the 2023 5th International Conference on Management Science …, 2023
2023
Applying Overall Equipment Effectiveness to Pipe Jacking Tunneling in Construction Industry
HC Horng, WZ Xu
Intelligent and Transformative Production in Pandemic Times: Proceedings of …, 2023
2023
Evaluating the effectiveness of FDM in identifying important factors in a dynamic flowshop
HC Horng, CC Hu, TM Cheng
Robotics and Computer-Integrated Manufacturing 25 (6), 894-900, 2009
2009
Transient Simulation Analysis on the Performance of Dispatching Rules in a Job Shop
H Horng, H Kao
SIMULATION SERIES 38 (4), 309, 2006
2006
Simulation constructs for computer-integrated JIT production systems: an object-oriented approach
HC Horng
Arizona State University, 1992
1992
A Simulation Study on the Flow Effectiveness of DBR Scheduling
HC Horng, KK Chien
個人化服務
查詢
The Learning and Forgetting Effects of Dynamic Workers on the Performance of Dispatching Rules in Flow Shops
HC HORNG, SP HU
Steady-state Simulation Comparison of Dispatching Rules in Open Shops
HC Horng, T County, CL Liu
The system can't perform the operation now. Try again later.
Articles 1–20