Follow
Péter Györgyi
Péter Györgyi
Institute for Computer Science and Control (MTA SZTAKI)
Verified email at sztaki.hu
Title
Cited by
Cited by
Year
Approximation schemes for parallel machine scheduling with non-renewable resources
P Györgyi, T Kis
European Journal of Operational Research 258 (1), 113-123, 2017
362017
Approximation schemes for single machine scheduling with non-renewable resource constraints
P Györgyi, T Kis
Journal of Scheduling 17, 135-144, 2014
302014
A probabilistic approach to pickup and delivery problems with time window uncertainty
P Györgyi, T Kis
European Journal of Operational Research 274 (3), 909-923, 2019
282019
Approximability of scheduling problems with resource consuming jobs
P Györgyi, T Kis
Annals of Operations Research 235 (1), 319-336, 2015
282015
Reductions between scheduling problems with non-renewable resources and knapsack problems
P Györgyi, T Kis
Theoretical Computer Science 565, 63-76, 2015
192015
Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints
P Györgyi, T Kis
Journal of Scheduling, 2019
142019
Minimizing the maximum lateness on a single machine with raw material constraints by branch-and-cut
P Györgyi, T Kis
Computers & Industrial Engineering 115, 220-225, 2018
142018
A PTAS for a resource scheduling problem with arbitrary number of parallel machines
P Györgyi
Operations Research Letters 45 (6), 604-609, 2017
142017
Suboptimal and conflict-free control of a fleet of AGVs to serve online requests
M Drótos, P Györgyi, M Horváth, T Kis
Computers & Industrial Engineering 152, 106999, 2021
122021
A common approximation framework for early work, late work, and resource leveling problems
P Györgyi, T Kis
European Journal of Operational Research 286 (1), 129-137, 2020
102020
New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints
P Györgyi, T Kis
Discrete Applied Mathematics 311, 97-109, 2022
62022
On the number of touching pairs in a set of planar curves
P Györgyi, B Hujter, S Kisfaludi-Bak
Computational Geometry 67, 29-37, 2018
52018
A multivariate complexity analysis of the material consumption scheduling problem
M Bentert, R Bredereck, P Györgyi, A Kaczmarczyk, R Niedermeier
Journal of Scheduling 26 (4), 369-382, 2023
42023
A P2P based storage system with reputation points and simulation results
B Bakondi, P Burcsi, P Györgyi, D Herskovics, P Ligeti, L Mérai, DA Nagy, ...
Central European Conference on Cryptology (CECC), 2014
22014
Scheduling with non-renewable resources
P Györgyi
Eötvös University, 2013
22013
Approximation algorithms for coupled task scheduling minimizing the sum of completion times
D Fischer, P Györgyi
Annals of operations research 328 (2), 1387-1408, 2023
12023
Joint replenishment meets scheduling
P Györgyi, T Kis, T Tamási, J Békési
Journal of Scheduling 26 (1), 77-94, 2023
12023
An online joint replenishment problem combined with single machine scheduling
P Györgyi, T Kis, T Tamási
Journal of Combinatorial Optimization 45 (5), 134, 2023
2023
Joint replenishment meets scheduling
T Kis, P Györgyi, T Tamási, J Békési
2022
Joint replenishment meets scheduling
J Békési, P Györgyi, T Kis
2020
The system can't perform the operation now. Try again later.
Articles 1–20