Follow
Hamed Samarghandi
Title
Cited by
Cited by
Year
An efficient tabu algorithm for the single row facility layout problem
H Samarghandi, K Eshghi
European Journal of Operational Research 205 (1), 98-105, 2010
1722010
A particle swarm optimization for the single row facility layout problem
H Samarghandi, P Taabayan, FF Jahantigh
Computers & Industrial Engineering 58 (4), 529-534, 2010
1652010
Studying the reasons for delay and cost overrun in construction projects: The case of Iran
H Samarghandi, SMM Tabatabaei, P Taabayan, A Mirhashemi, ...
Journal of Construction in Developing Countries 21 (1), 51-84, 2016
1192016
Take-back regulation: Remanufacturing or Eco-design?
M Pazoki, H Samarghandi
International Journal of Production Economics 227, 107674, 2020
622020
A meta-heuristic approach for solving the no-wait flow-shop problem
H Samarghandi, TY ElMekkawy
International Journal of Production Research 50 (24), 7313-7326, 2012
552012
On the exact solution of the no-wait flow shop problem with due date constraints
H Samarghandi, M Behroozi
Computers & Operations Research 81, 141-159, 2017
462017
A particle swarm optimisation for the no-wait flow shop problem with due date constraints
H Samarghandi
International Journal of Production Research 53 (9), 2853-2870, 2015
382015
Solving the no-wait flow-shop problem with sequence-dependent set-up times
H Samarghandi, TY ElMekkawy
International Journal of Computer Integrated Manufacturing 27 (3), 213-228, 2014
332014
A genetic algorithm and particle swarm optimization for no-wait flow shop problem with separable setup times and makespan criterion
H Samarghandi, TY ElMekkawy
The International Journal of Advanced Manufacturing Technology 61, 1101-1114, 2012
302012
Metaheuristics for fuzzy dynamic facility layout problem with unequal area constraints and closeness ratings
H Samarghandi, P Taabayan, M Behroozi
The International Journal of Advanced Manufacturing Technology 67 (9-12 …, 2013
262013
An efficient hybrid algorithm for the two-machine no-wait flow shop problem with separable setup times and single server
H Samarghandi, TY ElMekkawy
European Journal of Industrial Engineering 5 (2), 111-131, 2011
252011
A three-player game theory model for carbon cap-and-trade mechanism with stochastic parameters
H Mirzaee, H Samarghandi, K Willoughby
Computers & Industrial Engineering 169, 108285, 2022
222022
Solving the no-wait job shop scheduling problem with due date constraints: A problem transformation approach
H Samarghandi
Computers & Industrial Engineering 136, 635-662, 2019
222019
Minimizing the makespan in a flow shop environment under minimum and maximum time-lag constraints
H Samarghandi
Computers & Industrial Engineering 136, 614-634, 2019
172019
Studying the effect of server side-constraints on the makespan of the no-wait flow-shop problem with sequence-dependent set-up times
H Samarghandi
International Journal of Production Research 53 (9), 2652-2673, 2015
172015
Studying the effect of different combinations of timetabling with sequencing algorithms to solve the no-wait job shop scheduling problem
H Samarghandi, TY ElMekkawy, AMM Ibrahem
International Journal of Production Research 51 (16), 4942-4965, 2013
152013
Two-machine, no-wait job shop problem with separable setup times and single-server constraints
H Samarghandi, TY ElMekkawy
The International Journal of Advanced Manufacturing Technology 65, 295-308, 2013
122013
A robust optimization model for green supplier selection and order allocation in a closed-loop supply chain considering cap-and-trade mechanism
H Mirzaee, H Samarghandi, K Willoughby
Expert Systems with Applications 228, 120423, 2023
102023
Word-Of-Mouth and estimating demand based on network structure and epidemic models
M Pazoki, H Samarghandi
European Journal of Operational Research 291 (1), 323-334, 2021
92021
An Enumeration Algorithm for the No-Wait Flow Shop Problem with Due Date Constraints
H Samarghandi, M Behroozi
IFAC-PapersOnLine 49 (12), 1803-1808, 2016
92016
The system can't perform the operation now. Try again later.
Articles 1–20